HYDROTECSERVICES

Licensed plumber & regulatory work · The core capability

If it touches PUB, we handle it.

In Singapore, water and sanitary work isn't finished until PUB says it is. Hydrotec prepares the layouts, endorses them as licensed plumber, lodges the submissions and stays on it through inspection — so your programme doesn't stall at the approval step.

Plumbing layoutEndorsed
Form F — sanitary worksLodged
WSI — water supply installationLodged
Form E — temporary facilitiesWhere required
CCTV report (WRN)Where required
PUB inspectionArranged & attended
Water meterApplied & turned on

This is the paper trail every job leaves behind.

The process

How a submission runs

The same sequence, whether it's one pantry sink or a whole floor of toilets. You can hand us the whole job, or just the steps that need a licence.

01

Scope & layout

We survey, mark up or draw the plumbing layout, and state exactly what will be installed — itemised, with exclusions in writing.

02

Endorse & submit

As licensed plumber we endorse the layout and lodge the sanitary works submission (Form F) and water supply installation (WSI) submission — or Form E for temporary facilities — with PUB, coordinating with your QP where one is appointed.

03

Install & test

Work is carried out to the PUB Code of Practice. Where the sewer protection zone is involved, pre- and post-construction CCTV surveys are done to WRN requirements.

04

Inspection & approval

We arrange the PUB inspection, attend it, close out comments and apply for the meter or turn-on. The job ends approved, not just installed.

Common engagements

What we're asked for most

Endorsements

Endorsement-only

Your own plumber did the work, or the main contractor's house plumber is on site — you just need a licensed plumber to review and endorse the plan. We take these jobs, and have for years.

Meters

Meter applications

New PUB sub-meters for tenancies, meter upgrades and relocations, isolation and discharge of tanks when accounts terminate. Small jobs on paper — slow ones if the paperwork's wrong.

Site compliance

Construction-site compliance

Temporary toilet facilities with Form E, sewer connection and termination, CCTV surveys inside sewer protection zones, written direction replies. We've supported sites from HDB blocks to ports.

Proof, not promises

Fifteen years of submissions on file

Our archive holds fifteen years of Form F, WSI and Form E submissions, endorsements, meter applications, written-direction replies and CCTV reports — across HDB upgrading programmes, hospitals, schools, malls and CBD towers. Ask us about a job like yours and we'll point to one we've done.

Submission workWhereYears
P&S submissions for block upgradingHDB programmes islandwide — Punggol, Woodlands, Hougang, Bedok, Toa Payoh, Yishun2011–2026
Pre-construction CCTV survey, licensed plumber servicesJurong Port2016
Form E temporary facilities, sewer terminationConstruction sites — Senoko, Tuas, Bukit Timah2013–2026
Endorsements & meter submissionsRepublic Polytechnic, Centrepoint, Alexandra Central, childcare centres2015–2021
Written-direction submissions (licensed plumber replies)Major commercial developments2024

The licence behind the name

A named licensed plumber signs every submission.

Every submission and endorsement is signed by a named, licensed plumber — not a company stamp with nobody behind it. Verify the licence with PUB before you engage anyone, including us.

Licensed Water Service PlumberCheng Hwee Meng
PUB licence no.WS05011998
Registered Plumber no.19860285P
Singapore Plumbing SocietyMember 060M
DesignationManager, Hydrotec Services

These numbers are checkable — please check them.

Get it approved

Stuck at the PUB step?

Send the layout or the PUB correspondence — we'll tell you what it needs.